Step | Action | Yes | No |
---|---|---|---|
Schematic Reference: Instrument Cluster Schematics | |||
1 | Did you perform the IPC Diagnostic System Check? | ||
2 |
Does the system operate normally? | Go to Testing for Intermittent Conditions and Poor Connections in Wiring Systems | |
3 |
Does the engine oil level message data value indicate OK? | ||
4 |
Does the test lamp illuminate? | ||
5 |
Did you find and correct the condition? | ||
6 | Test the engine oil level indicator ground circuit for an open. Refer to Circuit Testing and Wiring Repairs in Wiring Systems. Did you find and correct the condition? | ||
7 |
Important: Perform the set up procedure for the replacement IPC. Replace the IPC. Refer to Instrument Cluster Replacement . Did you complete the replacement? | -- | |
8 |
Important: Perform the programming procedure for the replacement PCM. Replace the PCM. Refer to Powertrain Control Module Replacement in Engine Controls-3.4L. Did you complete the replacement? | -- | |
9 | Replace the engine oil level indicator switch. Refer to Engine Oil Level Sensor Replacement . Did you complete the replacement? | -- | |
10 | Operate the system in order to verify the repair. Did you correct the condition? | System OK |