Removal Procedure
- Remove the left-side instrument panel insulator. Refer to
Instrument Panel Insulator Panel Replacement - Left Side
in
Instrument Panel, Gages and Console.
- Remove the left-side carpet retainer. Refer to
Door Sill Plate Replacement
in Interior Trim.
- Remove the park brake
indicator switch electrical connector.
- Remove the park brake indicator switch screw.
- Remove the parking brake indicator switch.
Installation Procedure
- Install the park brake indicator switch.
Notice: Use the correct fastener in the correct location. Replacement fasteners
must be the correct part number for that application. Fasteners requiring
replacement or fasteners requiring the use of thread locking compound or sealant
are identified in the service procedure. Do not use paints, lubricants, or
corrosion inhibitors on fasteners or fastener joint surfaces unless specified.
These coatings affect fastener torque and joint clamping force and may damage
the fastener. Use the correct tightening sequence and specifications when
installing fasteners in order to avoid damage to parts and systems.
- Install the park
brake indicator switch screw.
Tighten
Tighten the screw to 3 N·m (27 lb in).
- Install the park brake
indicator switch electrical connector.
- Install the left-side carpet retainer. Refer to
Door Sill Plate Replacement
in Interior Trim.
- Install the left-side instrument panel insulator. Refer to
Instrument Panel Insulator Panel Replacement - Left Side
in
Instrument Panel, Gages and Console.