Callout
| Component Name
|
Preliminary Procedures
- Remove the left side catalytic converter. Refer to
Catalytic Converter Replacement - Left Side
- Support the engine. Refer to
Engine Support Fixture
.
|
1
| Rear Engine Mount Upper Nut
Notice: Refer to Fastener Notice in the Preface section.
Procedure
- Remove and discard rear engine mount upper nut.
- Allow adhesive on new engine mount nuts to cure for 24 hours after replacement.
Tip
• | Use engine support fixture to raise engine. |
• | The engine mount nuts must be replaced once removed. |
Tighten 50 N·m (37 lb ft) |
2
| Front Engine Mount Upper Nut
Procedure
- Remove and discard front engine mount upper nut.
- Allow adhesive on new engine mount nuts to cure for 24 hours after replacement.
Tip
• | Use engine support fixture to raise engine. |
• | The engine mount nuts must be replaced once removed. |
Tighten 50 N·m (37 lb ft) |
3
| Front Engine Mount Bracket Bolt
Tighten 58 N·m (43 lb ft) |
4
| Front Engine Mount Bracket
Tip To remove engine mount bracket, use engine support fixture to raise engine. |