Callout | Component Name |
---|---|
Preliminary Procedures
| |
1 | Front Insulator ProcedureLift upward on the front intake manifold insulator. |
2 | Purge Tube Assembly ProcedureDisconnect the purge tube assembly from the evaporative emission (EVAP) canister connector. |
3 | Right Side Intake Manifold Insulator Bolt (Qty: 3) Notice: Refer to Fastener Notice in the Preface section. ProcedureRemove the right side intake manifold insulator bolts. Tighten |
4 | Right Side Intake Manifold Insulator ProcedureRemove the left side insulator retaining bolts. Tighten |
5 | Left Side Insulator Bolt (Qty: 2) |
6 | Left Side Insulator ProcedureRemove the left side insulator. |