Install the 3 upper HVAC duct screws retaining the duct to the I/P. Tighten the screws to
3 N·m (27 lb in).
Install the 3 upper nuts retaining the I/P to the bulkhead. Tighten the nuts to
9 N·m (80 lb in).
Pull the I/P compartment folding panel (1) down and rearward to reveal the screw installation area.
Reach through the I/P storage compartment opening and install the screw retaining the I/P carrier to the I/P structure. Tighten the screw to
3 N·m (27 lb in).
Install the 2 screws located in the IPM opening. Tighten the screws to
3 N·m (27 lb in).
Install the end cap screw. Tighten the screws to
2.5 N·m (22 lb in).
Install the hazard switch harness through the routing hole.
Install the 2 screws retaining the I/P compartment door latch. Tighten the screws to
3 N·m (27 lb in).
Install the 3 lower I/P retaining screws located near the I/P storage compartment. Tighten the screws to
9 N·m (80 lb in).
Install the screw located behind the IPC. Tighten the screw to
9 N·m (80 lb in).
Install the 3 upper I/P bolt covers located on top of the I/P.