Step | Action | Value(s) | Yes | No | ||||
---|---|---|---|---|---|---|---|---|
Schematic Reference: Instrument Cluster Schematics | ||||||||
1 | Did you perform the Instrument Cluster Diagnostic System Check? | -- | Go to Step 2 | |||||
2 |
Does the Vehicle Speed parameter match the speedometer display? | -- | Go to Step 3 | Go to Step 4 | ||||
3 | Does the odometer operate properly? | -- | Go to Testing for Intermittent Conditions and Poor Connections in Wiring Systems | Go to Step 9 | ||||
4 |
Does the voltage measure greater than the specified value? | 9.0 V | Go to Step 7 | Go to Step 5 | ||||
5 | Test the vehicle speed signal circuit for an open or for a high resistance between the IPC and the PCM. Refer to Circuit Testing and to Wiring Repairs in Wiring Systems. Did you find and correct the condition? | -- | Go to Step 11 | Go to Step 6 | ||||
6 | Inspect for poor connections at the harness connector of the IPC. Refer to Testing for Intermittent Conditions and Poor Connections and to Connector Repairs in Wiring Systems. Did you find and correct the condition? | -- | Go to Step 11 | Go to Step 9 | ||||
7 | Test the vehicle speed signal circuit for a short to voltage between the IPC and the PCM. Refer to Circuit Testing and to Wiring Repairs in Wiring Systems. Did you find and correct the condition? | -- | Go to Step 11 | Go to Step 8 | ||||
8 | Inspect for poor connections at the harness connector of the PCM. Refer to Testing for Intermittent Conditions and Poor Connections and to Connector Repairs in Wiring Systems. Did you find and correct the condition? | -- | Go to Step 11 | Go to Step 10 | ||||
9 | Replace the IPC. Refer to Instrument Cluster Replacement . Did you complete the replacement? | -- | Go to Step 11 | -- | ||||
10 |
Important:: Program the replacement PCM. Replace the PCM. Refer to the following procedures:
Did you complete the replacement? | -- | Go to Step 11 | -- | ||||
11 | Operate the system in order to verify the repair. Did you correct the condition? | -- | System OK | Go to Step 2 |