GM Service Manual Online
For 1990-2009 cars only

CAMPAIGN: DIFFERENTIAL SHAFT LOCK SCREW LOOSENING

MODELS: 1982 C, K AND G15 - 25 LIGHT DUTY TRUCKS EQUIPPED WITH RPO G80 (8.50") EATON LOCKING DIFFERENTIAL

The following information revises the "Service Procedure" and "Warranty Information", sections of Campaign Bulletin 82C10, issued October, 1982

SERVICE PROCEDURE

Inspection

1. Raise vehicle on hoist.

2. Inspect rear axle code stamped on top of right axle tube outboard of carrier.

KHA G 001 1 --- - --- - Axle & Vehicle Source Date Shift Code Code Code Code ---- ---- ---- ---- G=Gear & Jan. 1=001 1st Shift Axle

A. When the source code is "W", "C" or "K", lower the vehicle and install the campaign completion label. No further action is required.

B. When the source code is "G", proceed with the following modification

3. Clean all dirt from around carrier cover.

4. Drain lubricant from carrier by removing cover.

5. Rotate the case to the position shown in Figure 1. Support the differential pinion shaft so that it cannot fall into the case and remove the differential pinion shaft lock screw and discard.

6. Clean the case assembly of any excessive lubricant in the threaded area of the lock screw hole.

7. Install new lock screw P/N 14056196, which is coated with an adhesive patch, and torque to 25 ft. lb.

8. Clean the carrier and cover of any old gasket material.

9. Install new gasket, P/N 3993593, and torque cover attaching bolts to 20 ft. lbs. Torque carrier cover bolts in a clockwise pattern to insure uniform draw on cover gasket.

10. Fill axle with 4.2 pints of lubricant, P/N 1052271 (24 oz. container) or P/N 1052272 (15 gal. container).

11. Lower vehicle

VEHICLE MUST REMAIN STATIONARY FOR AT LEAST TWO (2) HOURS FOLLOWING SERVICING INVOLVING LOCK SCREW INSTALLATION TO INSURE CURING OF ADHESIVE ON SCREW THREADS. HOWEVER, VEHICLE CAN BE MOVED FROM SERVICE AREA TO AN ONSITE PARKING AREA IF SUCH DRIVING IS MODERATE AND PERFORMED IMMEDIATELY AFRER COMPLETION OF AXLE SERVICING.

WARRANTY INFORMATION

Dealers should submit an accurately filled out Warranty Repair order on each vehicle completed under this campaign.

Labor Time Operation Allow- Trouble Number Description ance Code ------ ----------- ---- ---- V1401 Inspectrear 0.2 hr. 96 axle assembly for source code. Code not requiring pinion shaft lock screw replacement as identified in this bulletin indicate no further action required.

V1400 Replace pinion 0.5 hr. 96 shaft lock screw according to the instructions contained in this bulletin.

*Dealer to receive Administration Time Allowance associated with this campaign, add 0.1 hour to the Labor Operation Time Allowance.

PARTS INFORMATION

Parts required to complete this campaign are to be obtained by the dealer from your Warehousing and Distribution Division of General Motors.

Quantity Part Number Per Vehicle Description ----------- ----------- ----------- 14056196 1 Pinion Shaft Lock Screw

3993593 1 Cover Gasket

1052271 or 4.2 Pints Lubricant 1052272


Object Number: 93756  Size: MF

General Motors bulletins are intended for use by professional technicians, not a "do-it-yourselfer". They are written to inform those technicians of conditions that may occur on some vehicles, or to provide information that could assist in the proper service of a vehicle. Properly trained technicians have the equipment, tools, safety instructions and know-how to do a job properly and safely. If a condition is described, do not assume that the bulletin applies to your vehicle, or that your vehicle will have that condition. See a General Motors dealer servicing your brand of General Motors vehicle for information on whether your vehicle may benefit from the information.