GM Service Manual Online
For 1990-2009 cars only

Removal Procedure

  1. Apply the parking brake.
  2. Block the wheels.
  3. Drain all the reservoirs. Refer to Draining Reservoirs .
  4. Disconnect the air lines from the quick release valve.

  5. Object Number: 202632  Size: SH
  6. Remove the bolts (7).
  7. Remove the washers (1).
  8. Remove the nuts (8).
  9. Remove the quick release valve with double check (4).
  10. Inspect the air lines for damage, kinks or wear.

Installation Procedure


    Object Number: 202632  Size: SH
  1. Connect the quick release valve with double check (4) to the bracket (2).
  2. Install the bolts (7).
  3. Install the washers (1).
  4. Notice: Use the correct fastener in the correct location. Replacement fasteners must be the correct part number for that application. Fasteners requiring replacement or fasteners requiring the use of thread locking compound or sealant are identified in the service procedure. Do not use paints, lubricants, or corrosion inhibitors on fasteners or fastener joint surfaces unless specified. These coatings affect fastener torque and joint clamping force and may damage the fastener. Use the correct tightening sequence and specifications when installing fasteners in order to avoid damage to parts and systems.

  5. Install the nuts (8).
  6. Tighten
    Tighten the quick release valve with double check nuts (8) to 45 N·m (33 lb ft).

  7. Install the air lines.
  8. Start the engine.
  9. Charge the system air pressure to the governor cut-out point.
  10. Stop the engine.
  11. Check for air leaks using a soap solution.
  12. Refer to Air Brake System Leak Test .
  13. Remove the wheel blocks.