Step | Action | Value(s) | Yes | No |
---|---|---|---|---|
1 |
Did the test lamp light? | -- | Go to Step 2 | Go to Step 11 |
2 |
Did the test lamp light? | -- | Go to Step 3 | Go to Step 18 |
3 |
Did the test lamp light? | -- | Go to Step 4 | Go to Step 5 |
4 | Locate and repair the short to voltage in CKT 10 (YEL). Is the repair complete? | -- | System OK | -- |
5 | Connect a test lamp between terminal G in the DRL control module harness connector and chassis ground. Did the test lamp light? | -- | Go to Step 6 | Go to Step 19 |
6 | Connect a test lamp between terminal C in the DRL control module harness connector and chassis ground. Did the test lamp light? | -- | Go to Step 7 | Go to Step 20 |
7 | Connect a test lamp between terminals C and H in the DRL control module harness connector. Did the test lamp light? | -- | Go to Step 8 | Go to Step 21 |
8 |
Did the test lamp light? | -- | Go to Step 9 | Go to Step 10 |
9 | Locate and repair the short to ground in CKT 1134 (LT BLU). Is the repair complete? | -- | System OK | -- |
10 | Replace the DRL relay. Refer to Daytime Running Lamps (DRL) Relay Replacement . Is the repair complete? | -- | System OK | Go to Step 22 |
11 |
Did the test lamp light? | -- | Go to Step 15 | Go to Step 12 |
12 |
Did the test lamp light? | -- | Go to Step 13 | Go to Step 14 |
13 | Replace the headlamp switch. Is the repair complete? | -- | System OK | -- |
14 | Locate and repair the open in CKT 634 (YEL) between terminal B in the headlamp switch harness connector and terminal A in the DRL diode module harness connector. Is the repair complete? | -- | System OK | -- |
15 |
Did the test lamp light? | -- | Go to Step 16 | Go to Step 17 |
16 | Replace the DRL diode module. Is the repair complete? | -- | System OK | -- |
17 | Locate and repair the open in CKT 815 (WHT) between terminal B in the DRL diode module harness connector and terminal D5 in the DRL relay socket. Is the repair complete? | -- | System OK | -- |
18 | Locate and repair the open in CKT 39 (PNK) between S230 and terminal D1 in the DRL relay socket. Is the repair complete? | -- | System OK | -- |
19 | Locate the repair the open in CKT 592 (LT GRN/BLK) (592) between terminal G in the DRL control module harness connector and terminal D2 in the DRL relay socket. Is the repair complete? | -- | System OK | -- |
20 | Locate and repair the open in CKT 39 (PNK) between S230 and terminal C in the DRL control module harness connector. Is the repair complete? | -- | System OK | -- |
21 | Locate and repair the open in CKT 250 (BLK) between S231 and terminal H in the DRL control module harness connector. Is the repair complete? | -- | System OK | -- |
22 | Replace the DRL Control Module Refer to Daytime Running Lights (DRL) Control Module Replacement . Is the repair complete? | -- | System OK | -- |