Removal Procedure
- Remove the intake manifold cover. Refer to
Intake Manifold Cover Replacement
.
- Remove the air cleaner outlet duct. Refer to
Air Cleaner Outlet Duct Replacement
.
Important: It is not necessary to completely remove the PCV hose/pipe from the engine when removing the air intake pipe.
- Remove the positive crankcase ventilation (PCV) hose/pipe from the air intake pipe. Refer to
Positive Crankcase Ventilation Hose/Pipe/Tube Replacement
.
- Disconnect the turbocharger electrical connector. Lift the metal retainer, in order to disconnect.
- Remove the engine wire harness clamp bolt and reposition.
Important: The clamp for the air intake pipe uses reverse threads.
- Loosen the air intake pipe to turbocharger clamp (1).
- Remove the air intake pipe (2) from the turbocharger.
Installation Procedure
- Clean the mating surfaces on the air intake pipe (2) and the turbocharger.
Notice: Refer to Fastener Notice in the Preface section.
- Align the air intake pipe (2) to the turbocharger.
Important: The clamp for the air intake pipe uses reverse threads.
- Tighten the air intake pipe to turbocharger clamp (1).
Tighten
Tighten the clamp to 4.6 N·m (41 lb in).
- Install the engine wire harness clamp bolt.
Tighten
Tighten the bolt to 10 N·m (89 lb in).
- Connect the turbocharger electrical connector.
- Install the PCV hose/pipe. Refer to
Positive Crankcase Ventilation Hose/Pipe/Tube Replacement
.
- Install the air cleaner outlet duct. Refer to
Air Cleaner Outlet Duct Replacement
.
- Install the intake manifold cover. Refer to
Intake Manifold Cover Replacement
.