- Install the fuel meter
body (5) into the lower intake manifold (6).
- Install the 8 poppet nozzles into the lower intake manifold (6).
- Inspect the poppet nozzles in order to ensure that the poppet
nozzles are firmly seated and locked in the lower intake manifold bores.
- Install the NEW fuel meter body seal (4) into the groove
on the fuel meter body (5).
- Install the NEW upper intake manifold to lower intake manifold
gasket (3) into the groove of the upper intake manifold (2).
- Install the upper intake manifold (2) onto the lower intake
manifold (6).
- If reusing the fasteners, apply threadlock GM P/N United
States 12345382, GM P/N Canada 10953489, or equivalent,
to the threads of the upper intake manifold attaching studs (1).
Notice: Use the correct fastener in the correct location. Replacement fasteners
must be the correct part number for that application. Fasteners requiring
replacement or fasteners requiring the use of thread locking compound or sealant
are identified in the service procedure. Do not use paints, lubricants, or
corrosion inhibitors on fasteners or fastener joint surfaces unless specified.
These coatings affect fastener torque and joint clamping force and may damage
the fastener. Use the correct tightening sequence and specifications when
installing fasteners in order to avoid damage to parts and systems.
- Install the upper
intake manifold studs (1).
Tighten
- Tighten the upper intake manifold studs on the first pass to 5 N·m
(44 lb in).
- Tighten the upper intake manifold studs on the second pass to
10 N·m (89 lb in).
- If reusing the fasteners,
apply threadlock GM P/N United States 12345382, GM P/N Canada 10953489,
or equivalent, to the threads of the evaporative emission (EVAP) canister
purge solenoid valve studs.
- Install the EVAP canister purge solenoid valve and studs.
Tighten
Tighten the EVAP canister purge solenoid valve studs to 10 N·m
(89 lb in).
- Install the engine wiring harness bracket and nut.
Tighten
Tighten the engine wiring harness bracket nut to 12 N·m
(106 lb in).
- Install the NEW fuel seals (8), black O-rings, into the fuel
meter body.
- Install the NEW spacer rings (7), flat washers, into the
fuel meter body.
- Install the NEW fuel seals (6), yellow O-rings, into the
fuel meter body.
- Install the NEW fuel seal retainers (5) into the fuel meter
body.
- Install the fuel pipe (3) into the fuel meter body.
- Install the fuel pipe retainer (1) and the nuts (2).
- If reusing the fastener, apply threadlock GM P/N United
States 12345382, GM P/N Canada 10953489, or equivalent,
to the threads of the fuel pipe bolt (4).
- Install the fuel pipe bolt (4).
Tighten
- Tighten the fuel pipe retainer nuts (2) to 3 N·m
(27 lb in).
- Tighten the fuel pipe bolt (4) to 6 N·m (53 lb in).
- Install a NEW manifold
absolute pressure (MAP) sensor seal onto the MAP sensor.
- Apply a small amount, approximately 1 drop, of clean engine
oil to the MAP sensor seal.
- Install the MAP sensor into the upper intake manifold.
- Install the ignition coil
and studs.
Tighten
Tighten the ignition coil studs to 12 N·m (106 lb in).
- If reusing the engine
coolant temperature (ECT) sensor, apply sealant GM P/N United
States 12346004, GM P/N Canada 10953480, or equivalent,
to the threads of the ECT sensor.
- Install the ECT sensor into the front of the lower intake manifold.
Tighten
Tighten the ECT sensor to 20 N·m (15 lb ft).
Important: The EGR valve must be installed in the original orientation.
- Install a NEW exhaust gas recirculation (EGR) valve gasket and the EGR
valve.
- Install the EGR valve
bolts.
Tighten
- Tighten the EGR valve bolts on the first pass to 10 N·m
(88 lb in).
- Tighten the EGR valve bolts on the final pass to 30 N·m
(22 lb ft).
- Install the engine coolant
thermostat.
- Install the water outlet.
- Install the water outlet studs.
Tighten
Tighten the water outlet studs to 25 N·m (18 lb ft).
- Install a NEW throttle
body gasket into the groove in the upper intake manifold.
- Install the throttle body onto the upper intake manifold.
- If reusing the fasteners, apply threadlock GM P/N United
States 12345382, GM P/N Canada 10953489, or equivalent,
to the threads of the throttle body attaching studs.
- Install the throttle body attaching studs.
Tighten
Tighten the throttle body attaching studs to 9 N·m (80 lb in).
- Install the accelerator
control bracket, the bolt, and the nut.
Tighten
Tighten the accelerator control bracket bolt and the nut to 12 N·m
(106 lb in).