GM Service Manual Online
For 1990-2009 cars only

Generator Brace Replacement - Auxiliary Diesel, CS 130D

Removal Procedure

  1. Remove the drive belt. Refer to Drive Belt Replacement in Engine Mechanical.

  2. Object Number: 163784  Size: SH
  3. Remove the mounting bolts from the brace.
  4. The right-mounted version of the same generator is supported by a different brace at the rear of the generator.

  5. Remove the brace.

Installation Procedure


    Object Number: 163784  Size: SH
  1. Install the brace.
  2. Notice: Use the correct fastener in the correct location. Replacement fasteners must be the correct part number for that application. Fasteners requiring replacement or fasteners requiring the use of thread locking compound or sealant are identified in the service procedure. Do not use paints, lubricants, or corrosion inhibitors on fasteners or fastener joint surfaces unless specified. These coatings affect fastener torque and joint clamping force and may damage the fastener. Use the correct tightening sequence and specifications when installing fasteners in order to avoid damage to parts and systems.

  3. Install the mounting bolts to the brace.
  4. Tighten

        • Tighten the auxiliary generator mounting long bolts to 50 N·m (37 lb ft)
            Tightening specifications include bolts for right mounted brace.
        • Tighten the auxiliary generator mounting short bolts to 25 N·m (18 lb ft)
  5. Install the drive belt. Refer to Drive Belt Replacement in Engine Mechanical.