Removal Procedure
Tools Required
J 39664
Manifold
Cover Set
Important: Clean all the line fittings that will be loosened or removed.
Caution: Unless directed otherwise, the ignition and start switch must be in the OFF or LOCK position, and all electrical loads must be OFF before servicing
any electrical component. Disconnect the negative battery cable to prevent an electrical spark should a tool or equipment come in contact with an exposed electrical terminal. Failure to follow these precautions may result in personal injury and/or damage to
the vehicle or its components.
- Remove the
negative battery cables.
- Remove the intake manifold. Refer to
Intake Manifold Replacement
.
Important: Before any further service work is to be done, cover the intake ports
with the J 39664
- Remove the injection line clips at the loom brackets.
- Remove the injection lines at the nozzles.
• | Cap the lines and the nozzles immediately. |
• | Do not bend the injection lines. |
- Remove the injection lines at the pump. Refer to
Fuel System Description
.
• | Cap the lines and the pump fittings immediately. |
• | Tag the lines for installation. |
Installation Procedure
- Install the injection lines at the pump. Refer to
Fuel System Description
.
• | Uncap the lines and pump fittings. |
• | Refer to the tags for the correct installation. |
• | Install the injection lines at the nozzles. |
Notice: Use the correct fastener in the correct location. Replacement fasteners
must be the correct part number for that application. Fasteners requiring
replacement or fasteners requiring the use of thread locking compound or sealant
are identified in the service procedure. Do not use paints, lubricants, or
corrosion inhibitors on fasteners or fastener joint surfaces unless specified.
These coatings affect fastener torque and joint clamping force and may damage
the fastener. Use the correct tightening sequence and specifications when
installing fasteners in order to avoid damage to parts and systems.
- Uncap the lines
and the nozzles.
Tighten
Tighten the fittings to 25 N·m (20 lb ft).
- Install the injection line clips at the loom brackets.
- Remove the J 39664
manifold cover set.
- Install the intake manifold. Refer to
Intake Manifold Replacement
- Install the negative battery cables.