Caution: Natural gas is highly flammable. In order to reduce the risk of fire and personal injury, keep sparks, flames, and smoking materials away from the vehicle while you perform the Compressed Natural Gas (CNG) fuel system service.
Caution: The Compressed Natural Gas (CNG) system operates at pressures up to 24820 kpa (3600 psi). Relieve the CNG fuel system pressure before servicing CNG fuel system components in order to reduce the risk of fire and personal injury.
Caution: Unless directed otherwise, the ignition and start switch must be in the OFF or LOCK position, and all electrical loads must be OFF before servicing any electrical component. Disconnect the negative battery cable to prevent an electrical spark should a tool or equipment come in contact with an exposed electrical terminal. Failure to follow these precautions may result in personal injury and/or damage to the vehicle or its components.
• | The inlet fitting (3). |
• | The outlet elbow (6). |
J 41416 Ultrasonic Leak Detector
Notice: Use the correct fastener in the correct location. Replacement fasteners must be the correct part number for that application. Fasteners requiring replacement or fasteners requiring the use of thread locking compound or sealant are identified in the service procedure. Do not use paints, lubricants, or corrosion inhibitors on fasteners or fastener joint surfaces unless specified. These coatings affect fastener torque and joint clamping force and may damage the fastener. Use the correct tightening sequence and specifications when installing fasteners in order to avoid damage to parts and systems.
Important: Apply pipe thread sealant with Teflon® to the threads of the outlet elbow and the inlet fitting before installation. Do not use Teflon® tape.
1.1. | Assemble the outlet elbow (6) to the LPR (1). Position it vertically when installing. |
Tighten
Tighten the outlet elbow finger tight plus one to three turns to the
correct position.
1.2. | Assemble the inlet fitting (3) to the LPR (1). Position it vertically when installing. |
Tighten
Tighten the inlet fitting finger tight plus one to three turns to the
correct position.
Tighten
Tighten the LPR bracket bolts to 12 N·m (108 lb in).
Caution: Natural gas is stored under high pressure. If a leak occurs, the high pressure could cause a personal injury. In order to prevent Compressed Natural Gas (CNG) fuel leaks, always replace the CNG fuel system O-rings during service.
Tighten
Tighten the LPL to LPR fuel line fittings to 37 N·m (27 lb ft).
Tighten
Tighten the ignition coil bracket studs to 12 N·m (108 lb in).
Tighten
Tighten the wire harness bracket nuts to 9.5 N·m (84 lb in).
Tighten
Tighten the exhaust manifold nuts to 27 N·m (20 lb ft).
Tighten
Tighten the fuel vapor hose clamp to 2 N·m (18 lb in).
Tighten
Tighten the GMS inlet elbow screws to 5.4 N·m (48 lb in).
Tighten
Tighten the fuel line at LPL inlet fitting to 37 N·m (27 lb ft).
Tighten
Tighten the negative battery terminal to 15 N·m (11 lb ft).