Removal Procedure
Remove the right wheelhouse panel. Refer to
Wheelhouse Panel Replacement
in Body Front End of the C/K Truck Service Manual.
Installation Procedure
If the right wheelhouse panel is replaced, the new panel must be drilled
for the second heater hose clip as follows:
- Measure and mark the panel
as shown.
- Drill the upper hole (1) to 6.4 mm (3/8 in) diameter.
- Drill the lower hole (2) to 9.5 mm (1/4 in) diameter.
- Treat each hole with a zinc-rich primer or equivalent.
- Install the right wheelhouse panel. Refer to
Wheelhouse Panel Replacement
in Body Front End of the C/K Truck Service Manual.