Notice: Use the correct fastener in the correct location. Replacement fasteners
must be the correct part number for that application. Fasteners requiring
replacement or fasteners requiring the use of thread locking compound or sealant
are identified in the service procedure. Do not use paints, lubricants, or
corrosion inhibitors on fasteners or fastener joint surfaces unless specified.
These coatings affect fastener torque and joint clamping force and may damage
the fastener. Use the correct tightening sequence and specifications when
installing fasteners in order to avoid damage to parts and systems.
- Install the fuel junction block and nuts.
Tighten
Tighten the nuts to 25 N·m (18 lb ft).
- Install the fuel pipe junction block to the fuel rail (1).
Tighten
Tighten the bolt to 15 N·m (11 lb ft).
- Connect the fuel pipes (3) to the junction block.
Tighten
Tighten the fittings to 44 N·m (32 lb ft).
- Connect the fuel pipe junction block to
the fuel rail (1).
Tighten
Tighten the fitting to 44 N·m (32 lb ft).
- Install the charged air cooler inlet duct
to the turbocharger.
- Align the mark on the duct (2) with the mark on the turbocharger.
- Position the clamp (1) as shown for proper clearance.
Tighten
Tighten the clamp to 6 N·m (53 lb in).
- Install the PCV hose to the upper valve rocker arm cover.
- Reposition the PCV hose clamp.
- Install the water outlet tube using the
following procedure:
10.1. | Install a new O-ring seal on the water outlet tube. |
10.2. | Lightly lubricate the O-ring seal with coolant. |
10.3. | Install the water outlet tube. |
10.4. | Install the bolt attaching the water outlet tube to the thermostat housing. |
Tighten
Tighten the bolt to 21 N·m (16 lb ft).
10.5. | Install the bolts attaching the water outlet tube to the rocker arm cover. |
Tighten
Tighten the bolts to 21 N·m (16 lb ft).
- Install the turbocharger coolant hose and
clamp to the turbocharger bypass valve.
- Connect the oil pressure sending unit electrical connector.
- Connect the left front injector harness
electrical connector (1).
- Install the A/C compressor using the following
procedure:
14.1. | Install the A/C compressor bolts. |
Tighten
Tighten the bolts to 50 N·m (37 lb ft).
14.2. | Connect the A/C cut out switch electrical connector. |
14.3. | Connect the A/C compressor clutch electrical connector. |
- Install the drive belt. Refer to
Drive Belt Replacement
in Engine Mechanical - 6.6L.
- Fill the cooling system. Refer to
Cooling System Draining and Filling
in Engine Cooling.
- Install the upper intake manifold cover.
- Install the upper intake manifold cover to the outlet duct.
- Tighten the outlet duct clamp at the upper intake manifold cover.
Tighten
Tighten the clamp to 6 N·m (53 lb in).
- Connect the negative battery cable. Refer to
Battery Negative Cable Disconnection and Connection
in Engine Electrical.
- Position the hood in the normal operating position by moving the hood hinge
bolts from the service position (2) to the normal operating position (1).
Tighten
Tighten the bolts to 25 N·m (18 lb ft).
- Purge air from the fuel system.