Step | Action | Value(s) | Yes | No |
---|---|---|---|---|
DEFINITION: This diagnostic procedure should only be used to diagnose a complete failure of the park lamp system. | ||||
1 | Was the Exterior Lamp System Check performed? | -- | Go to Step 2 | |
2 |
Is there Battery voltage? | -- | Go to Step 3 | Go to Step 5 |
3 |
Is there continuity? | -- | Go to Step 4 | Go to Step 6 |
4 | Repair open in CKT 9 (BRN) between headlamp and panel switch and S210. Refer to Wiring Repairs in Wiring Systems. Is the repair complete? | -- | -- | |
5 | Repair open in CKT 240 (ORN) between headlamp and panel switch and The I/P fuse block. Refer to Wiring Repairs in Wiring Systems. Is the repair complete? | -- | -- | |
6 | Replace the headlamp and panel dimmer switch. Is the repair complete? | -- | -- |