Install new O-rings whenever a fitting joint is opened.
J 38042 Dual O-Ring Tube Separator
Perform the following steps in order to service the dual O-ring joint:
Replace any damaged components in order to prevent refrigerant leakage.
Use a nonmetallic tool when removing the O-rings in order to prevent the chance of damaging the seal surface.
Notice: Use the correct fastener in the correct location. Replacement fasteners must be the correct part number for that application. Fasteners requiring replacement or fasteners requiring the use of thread locking compound or sealant are identified in the service procedure. Do not use paints, lubricants, or corrosion inhibitors on fasteners or fastener joint surfaces unless specified. These coatings affect fastener torque and joint clamping force and may damage the fastener. Use the correct tightening sequence and specifications when installing fasteners in order to avoid damage to parts and systems.
Important: Dual O-ring fittings are different in size from the standard A/C fitting O-rings.
Tighten
Tighten the aluminum nut to 24 N·m (18 lb ft).