Step | Action | Value(s) | Yes | No |
---|---|---|---|---|
1 | Did you review the charging system operation and perform the necessary inspections? | -- | ||
2 | Verify that the charge indicator is inoperative. Does the charge indicator operate normally? | -- | Go to Testing for Intermittent Conditions and Poor Connections in Wiring Systems | |
3 | Using the scan tool, inspect for DTCs. Are any DTCs present? | -- | Go to the Appropriate DTC | |
4 |
Do all of the indicators turn ON and OFF properly? | -- | Go to Diagnostic System Check - Instrument Cluster in Instrument Panel, Gauges and Console | |
5 | Test for voltage at pin B of the generator. Is the voltage within the specified range? | 9-16 V | ||
6 | Replace the generator Refer to Generator Replacement . Is the repair complete? | -- | -- | |
7 | Locate and repair the open in CKT 225 (RED) between the generator and the PCM/VCM Refer to Circuit Testing and Wiring Repairs in Wiring Systems. Is the repair complete? | -- | -- | |
8 | Operate the system in order to verify the repair. Did you correct the condition? | -- | System OK |