Step | Action | Value(s) | Yes | No |
---|---|---|---|---|
1 | Did you perform the Power Door Systems Diagnostic System Check? | -- | Go to Step 2 | |
2 | Verify that the RF power window is inoperative from the RF switch. Do the power windows operate normally? | -- | Go to Testing for Intermittent Conditions and Poor Connections in Wiring Systems | Go to Step 3 |
3 |
Is battery voltage present? | B+ | Go to Step 5 | Go to Step 4 |
4 | Locate and repair the open or the high resistance in CKT 1001 (DK GRN) between the left door lock and side window switch and the side window lockout switch. Refer to Testing for Continuity and Wiring Repairs in wiring systems. Is the repair complete? | -- | Go to Step 12 | -- |
5 |
Is battery voltage present? | B+ | Go to Step 9 | Go to Step 6 |
6 | Inspect for a poor connection at the side window lockout switch. Is the connection OK? | -- | Go to Step 8 | Go to Step 7 |
7 | Repair the connection as necessary. Is the repair complete? | -- | Go to Step 12 | -- |
8 | Replace the side window lockout switch. Is the repair complete? | -- | Go to Step 12 | -- |
9 |
Is battery voltage present? | B+ | Go to Step 11 | Go to Step 10 |
10 | Locate and repair the open or the high resistance in CKT 1307 (DK BLU), terminal B at the side window lockout switch and S306, or CKT 100 (DK GRN) from S306 to terminal F at the right door lock and side window switch. Refer to Testing for Continuity and Wiring Repairs in wiring systems. Is the repair complete? | -- | Go to Step 12 | -- |
11 | Replace the right door lock and side window switch. Refer to Front Side Door Window Switch Replacement in doors. Is the repair complete? | -- | Go to Step 12 | -- |
12 | Operate the system in order to verify the repair. Did you correct the condition? | -- | System OK | Go to Step 3 |