Step | Action | Yes | No |
---|---|---|---|
1 | Did you perform the Engine Electrical Diagnostic System Check? | Go to Step 2 | |
2 |
Does the charge indicator illuminate? | Go to Step 3 | Go to Testing for Intermittent Conditions and Poor Connections in Wiring Systems |
3 |
Does the charge indicator remain illuminated? | Go to Step 4 | Go to Step 5 |
4 | Test the charge indicator control circuit for a short to ground. Refer to Circuit Testing and Wiring Repairs in Wiring Systems. Did you find and correct the condition? | Go to Step 7 | Go to Step 6 |
5 | Replace the generator. Refer to Generator Replacement . Did you complete the replacement? | Go to Step 7 | -- |
6 |
Important: Perform the set up procedure for the PCM. Replace the PCM. Refer to Powertrain Control Module Replacement in Engine Controls-2.2L or Powertrain Control Module Replacement in Engine Controls-4.3L. Did you complete the replacement? | Go to Step 7 | -- |
7 | Operate the system in order to verify the repair. Did you correct the condition? | System OK | Go to Step 3 |