Step | Action | Value(s) | Yes | No | ||||||
---|---|---|---|---|---|---|---|---|---|---|
1 | Did you perform the Lighting Diagnostic System Check? | -- | Go to Step 2 | |||||||
2 | Check the following fuses:
Are the fuses functional? | -- | Go to Step 4 | Go to Step 3 | ||||||
3 | Locate overload and replace fuse(s). Is the repair complete? | -- | Go to Step 20 | -- | ||||||
4 | With DMM, check for battery voltage from cavity D CKT 1840 (ORN) of the headlamp switch to ground. Is battery voltage present? | B+ | Go to Step 6 | Go to Step 5 | ||||||
5 | Locate and repair OPEN in CKT 1840 (ORN) between the headlamp switch and splice S330. Is the repair complete? | -- | Go to Step 20 | -- | ||||||
6 |
Is battery voltage present? | B+ | Go to Step 8 | Go to Step 7 | ||||||
7 | Replace the headlamp switch. Headlamp Switch Replacement Is the repair complete? | -- | Go to Step 20 | -- | ||||||
8 | Probe the following two cavities of the headlamp relay with DMM for battery voltage (located in the underhood fuse block):
Is battery voltage present at both cavities? | B+ | Go to Step 10 | Go to Step 9 | ||||||
9 | Locate and repair the OPEN in one of the CKT's:
Is the repair complete? | -- | Go to Step 20 | -- | ||||||
10 |
Is resistance within specified range? | 40-110ohms | Go to Step 12 | Go to Step 11 | ||||||
11 | Replace the headlamp relay. Is the repair complete? | -- | Go to Step 20 | -- | ||||||
12 |
Is battery voltage present? | B+ | Go to Step 13 | Go to Step 11 | ||||||
13 | Using a DMM, check for continuity of ground CKT 250 (BLK) between cavity B3 of the headlamp relay to ground G101. Is continuity present? | -- | Go to Step 15 | Go to Step 14 | ||||||
14 | Locate and repair OPEN in CKT 250 (BLK) between cavity B3 of the headlamp relay to ground G101. Is the repair complete? | -- | Go to Step 20 | -- | ||||||
15 | Check for battery voltage at both headlamp fuses located in the underhood fuse block. Is battery voltage present? | B+ | Go to Step 17 | Go to Step 16 | ||||||
16 |
Is the repair complete? | -- | Go to Step 20 | -- | ||||||
17 | Check for battery voltage at cavity E13 of steering column connector C201. Is battery voltage present? | B+ | Go to Step 19 | Go to Step 18 | ||||||
18 |
Is the repair complete? | -- | Go to Step 20 | -- | ||||||
19 | Locate and repair OPEN in CKT 544 (PPL) between C201 and the DRL relay. Is the repair complete? | -- | Go to Step 20 | -- | ||||||
20 | Operate the system in order to verify the repair. Did you correct the condition? | -- | System OK | Go to Step 2 |