Caution: Avoid breathing fumes and swallowing EGR exhaust deposits when removing components for cleaning as bodily injury may result.
Whenever the EGR valve is removed, or during regularly scheduled EGR system maintenance, the EGR system should be inspected and cleaned. This will insure that the EGR system will function properly under all operating conditions. Proper EGR system service consists of the following five steps:
3.1. | Remove the EGR valve from the engine. |
3.2. | While holding the EGR valve in your hand, using a pencil eraser or other suitable soft instrument to depress the pintle several times. The pintle should move in and out smoothly, replace any valve that exhibits tendencies to stick. |
3.3. | While holding the EGR valve base in your hand, try to rotate the connector housing. Repeat for the coil housing. Replace any valve that exhibits looseness. |
3.4. | Inspect the EGR valve pintle and seat for deposits. Use a cloth or other suitable soft device to remove deposits. Remove all loose particles. If deposits are such that pintle/base interface can't be cleaned adequately to allow pintle to seal against the seat, replace the valve. Damage to the powdered metal EGR valve base will occur if cleaned with solvents, sharp tools, wire brush/wheel or sand blasting. Cleaning by these methods is not recommended. |
3.5. | Inspect the passage in the intake manifold for deposits. Remove all loose particles. |
3.6. | Replace EGR valve on engine, using a new gasket. |
3.7. | Wash-up after any contact with deposits from the EGR System. |
Caution: Unless directed otherwise, the ignition and start switch must be in the OFF or LOCK position, and all electrical loads must be OFF before servicing any electrical component. Disconnect the negative battery cable to prevent an electrical spark should a tool or equipment come in contact with an exposed electrical terminal. Failure to follow these precautions may result in personal injury and/or damage to the vehicle or its components.
Important: Make sure that both mating surfaces are aligned properly, before performing tightening procedure.
Notice: Use the correct fastener in the correct location. Replacement fasteners must be the correct part number for that application. Fasteners requiring replacement or fasteners requiring the use of thread locking compound or sealant are identified in the service procedure. Do not use paints, lubricants, or corrosion inhibitors on fasteners or fastener joint surfaces unless specified. These coatings affect fastener torque and joint clamping force and may damage the fastener. Use the correct tightening sequence and specifications when installing fasteners in order to avoid damage to parts and systems.
Tighten
Tighten the linear EGR valve pipe flange bolts (3) to the exhaust manifold
(5) to 26 N·m(19 lb ft).
Tighten
Tighten the linear EGR valve pipe flange nut (6) to the intake manifold
(1) to 60 N·m(44 lb ft).