Step | Action | Value(s) | Yes | No |
---|---|---|---|---|
1 | Was the DRL System Check performed? | -- | Go to Step 2 | |
2 |
Is continuity present? | -- | Go to Step 4 | Go to Step 3 |
3 | Repair the open in CKT 592 (LT GRN/BLK) between the instrument cluster and the DRL control module. Is the DRL indicator operative? | -- | Go to Step 4 | |
4 |
Does the test lamp light? | -- | Go to Step 5 | Go to Step 8 |
5 | Is the filament of the DRL indicator lamp open? | -- | Go to Step 6 | Go to Step 7 |
6 | Replace the DRL indicator lamp. Is the DRL indicator operative? | -- | Go to Step 7 | |
7 | Replace the instrument cluster. Is the DRL indicator operative? | -- | Go to Step 8 | |
8 | Repair the open in CKT 39 (PNK) between splice S216 and the instrument cluster. Is the DRL indicator operative? | -- | -- |