Step | Action | Value(s) | Yes | No |
---|---|---|---|---|
1 | Was the DRL System Check performed? | -- | ||
2 |
Does the test lamp light? | -- | ||
3 | Connect a J 39200 DMM between the daytime running lamp control module connector cavity H for CKT 150 (BLK) and a known good ground. Is continuity present? | -- | ||
4 | Repair the open in CKT 39 (PNK) between the IP fuse block and the daytime running lamp control module. Is the repair complete? | -- | -- | |
5 |
Does the test lamp light? | -- | ||
6 | Repair the open in CKT 150 (BLK) between the daytime running lamp control module and ground G201. Is the repair complete? | -- | -- | |
7 | Connect a J 39200 DMM between the IP relay center cavity D1 and the daytime running lamp control module connector cavity G for CKT 592 (LT GRN/BLK ). Is continuity present? | -- | ||
8 | Repair the open in CKT 340 (ORN) between the IP fuse block and the IP relay center cavity C1.. Is the repair complete? | -- | -- | |
9 | Replace the daytime running lamp control module. Is the repair complete? | -- | -- | |
10 | Repair the open in CKT 592 (LT GRN/BLK) between the daytime running lamp control module connector and the IP relay center. Is the repair complete? | -- | -- |
Step | Action | Value(s) | Yes | No |
---|---|---|---|---|
1 | Was the DRL System Check performed? | -- | ||
2 |
Does the test lamp light? | -- | ||
3 | Connect a J 39200 DMM between the daytime running lamp control module connector cavity H for CKT 150 (BLK) and a known good ground. Is continuity present? | -- | ||
4 | Repair the open in CKT 39 (PNK) between the IP fuse block and the daytime running lamp control module. Is the repair complete? | -- | -- | |
5 |
Does the test lamp light? | -- | ||
6 | Repair the open in CKT 150 (BLK) between the daytime running lamp control module and ground G201. Is the repair complete? | -- | -- | |
7 | Connect a J 39200 DMM between the IP relay center cavity D1 and the daytime running lamp control module connector cavity G for CKT 592 (LT GRN/BLK ). Is continuity present? | -- | ||
8 | Repair the open in CKT 340 (ORN) between the IP fuse block and splice S203. Is the repair complete? | -- | -- | |
9 | Replace the daytime running lamp control module. Is the repair complete? | -- | -- | |
10 | Repair the open in CKT 592 (LT GRN/BLK) between the daytime running lamp control module connector and the IP relay center. Is the repair complete? | -- | -- |