Step | Action | Value(s) | Yes | No |
---|---|---|---|---|
1 | Was the Interior Lamps System Check performed? | -- | Go to Step 2 | |
2 |
Does the test lamp light? | -- | Go to Step 4 | Go to Step 3 |
3 | Repair the open in CKT 40 (ORN) between the right stepwell lamp connector and splice S309 (base) or splice S232 (upfitter provisions). Is the right stepwell lamp operative? | -- | Go to Step 4 | |
4 |
Is continuity present? | -- | Go to Step 5 | Go to Step 6 |
5 | Replace the right stepwell lamp bulb. Is the right stepwell lamp operative? | -- | Go to Step 6 | |
6 | Repair the open in CKT 156 (WHT) between splice S305 (base) or splice S230 (upfitter provisions) and the right stepwell lamp connector. Is the right stepwell lamp operative? | -- | -- |