GM Service Manual Online
For 1990-2009 cars only

Generator Battery Connector Replacement 5.3L Engine w/RPO HP2

Removal Procedure


    Object Number: 1237047  Size: SH
  1. Disconnect the generator battery carrier. Refer to Hybrid Battery Service Disconnect/Connect .
  2. Remove the generator battery carrier intermediate cover. Refer to Battery Cover Replacement .
  3. Remove the 42-volt positive/negative cable retainer nuts, and retainer.

  4. Object Number: 1237048  Size: SH
  5. Remove the red connector position assurance (CPA) retainer.
  6. Disconnect the 42-volt positive/negative cable electrical connector (4).

  7. Object Number: 1403628  Size: SH
  8. Remove the service disconnect power cable nut (1) and cable from the high current connector (HCC).

  9. Object Number: 1403634  Size: SH
  10. Remove the HCC power cable nut and cable from battery 3.
  11. Remove the HCC screws.

  12. Object Number: 1403635  Size: SH
  13. Remove the HCC.

Installation Procedure


    Object Number: 1403635  Size: SH
  1. Install the HCC.
  2. Notice: Refer to Fastener Notice in the Preface section.


    Object Number: 1403634  Size: SH
  3. Install the HCC screws.
  4. Tighten
    Tighten the screws to 5 N·m (44 lb in).

  5. Install the HCC power cable and nut to battery 3.
  6. Tighten
    Tighten the nut to 10 N·m (89 lb in).


    Object Number: 1403628  Size: SH
  7. Install the service disconnect power cable and nut (1) to the HCC.
  8. Tighten
    Tighten the nut to 10 N·m (89 lb in).


    Object Number: 1237048  Size: SH
  9. Connect the 42-volt positive/negative cable electrical connector (4).
  10. Install the red CPA retainer.

  11. Object Number: 1237047  Size: SH
  12. Install the 42-volt positive/negative cable retainer and nuts.
  13. Tighten
    Tighten the nuts to 20 N·m (15 lb ft).

  14. Install the generator battery carrier intermediate cover. Refer to Battery Cover Replacement .