Removal Procedure
- If equipped with regular production option (RPO) HP2, disconnect the energy storage box (ESB). Refer to
Hybrid Battery Service Disconnect/Connect
.
- Remove the spark plug wire from the ignition coil.
- Disconnect the ignition coil electrical connector.
- If equipped with regular production option (RPO) HP2, remove the auxiliary heater water pump bracket bolts.
- Remove the auxiliary heater water pump from the studs, and reposition out of the way.
- If equipped with RPO HP2, remove the starter/generator control module (SGCM) cover bolts, and cover.
- Remove the 3-phase cable nuts to the SGCM.
- Remove the 3-phase cable from the SGCM.
- If equipped with RPO HP2, remove the 3-phase cable bracket nuts (2).
- Remove the 3-phase cable bracket (1) from the studs, and reposition the cable and bracket out of the way.
- Remove the ignition coil bolts.
- Remove the ignition coil.
Installation Procedure
- Install the ignition coil.
Notice: Refer to Fastener Notice in the Preface section.
- Install the ignition coil bolts.
Tighten
Tighten the bolts to 8 N·m (71 lb in).
- If equipped with RPO HP2, position the cable (w/bracket) and install the 3-phase cable bracket to the studs.
- Install the 3-phase cable bracket nuts (2).
Tighten
Tighten the nuts to 15 N·m (11 lb ft).
- If equipped with RPO HP2, install the 3-phase cable to the SGCM.
- Install the 3-phase cable nuts to the SGCM.
Tighten
Tighten the nuts to 9 N·m (80 lb in).
- Install the SGCM cover and bolts.
Tighten
Tighten the bolts to 9 N·m (80 lb in).
- If equipped with RPO HP2, position the auxiliary heater water pump and install it onto the studs.
- Install the auxiliary heater water pump bracket bolts.
Tighten
Tighten the bolts to 15 N·m (11 lb ft).
- Connect the ignition coil electrical connector.
- Install the spark plug wire to the ignition coil.
- If equipped with RPO HP2, connect the ESB. Refer to
Hybrid Battery Service Disconnect/Connect
.