- Install the
J 36857
(1) to the rear of the left cylinder head with a suitable
bolt.
- Install the
J 36857
(1) to the front of the right cylinder head with a suitable
bolt.
- Install a suitable lifting device. The engine will have to be angled in order to install. Use a load positioning sling to assist in angling the engine.
- Remove the engine from the stand. Refer to
Engine Removal from Stand.
- Install the following:
- Install the engine in the vehicle.
Note: Do not draw the engine to the transmission using the transmission bolts. If everything is aligned properly the engine and transmission will come together easily.
- Loosely install 2 transmission to engine bolts.
Caution: Refer to Fastener Caution in the Preface section.
- Install the left and right side engine mount frame brackets, if equipped.
Tighten
Tighten the through-bolts to 75 N·m (55 lb ft).
- Install the engine mount to frame bracket bolts (left side shown).
Tighten
Tighten the bolts to 65 N·m (50 lb ft).
- Remove the
J 36857
from the cylinder heads.
- Raise the vehicle.
- Install the transmission to engine bolts (automatic transmission shown).
Tighten
Tighten the studs and bolts to 50 N·m (37 lb ft).
- If equipped with an automatic transmission install the torque convertor bolts.
Tighten
Tighten the bolts to 60 N·m (44 lb ft).
- If equipped with an automatic transmission, install the nuts retaining the transmission fluid fill tube bracket.
Tighten
Tighten the nuts to 18 N·m (13 lb ft).
- If the vehicle is 4WD equipped, install the front differential carrier assembly. Refer to
Differential Carrier Assembly Replacement.
- If equipped with an automatic transmission, install the nut retaining the transmission oil cooler line clip.
Tighten
Tighten the nut to 9 N·m (80 lb in).
- Install the exhaust pipe to the exhaust outlet.
- Install the exhaust manifold pipe to the exhaust outlet clamp.
Tighten
Tighten the clamp to 40 N·m (30 lb ft).
- Lower the vehicle to work through the front fender wheelhouse openings.
- Install the bolt retaining the battery negative cable and the engine wiring harness
ground wire to the left side of the engine.
Tighten
Tighten the bolt to 34 N·m (25 lb ft).
- Install the bolts holding the battery cable channel retainer to the lower crankcase.
Tighten
Tighten the bolts to 12 N·m (106 lb ft).
- Install the bolts holding the auxiliary battery negative cable and the engine wiring harness ground wires
to the right side of the engine.
Tighten
Tighten the bolts to 34 N·m (25 lb ft).
- Install the nut holding the battery cable bracket to the right side of the lower crankcase.
Tighten
Tighten the nut to 8 N·m (71 lb in).
- Install the starter. Refer to
Starter Replacement.
- Connect the cord for the engine coolant heater.
- Install the engine oil pan skid plate. Refer to
Oil Pan Skid Plate Replacement.
- Install the engine shield. Refer to
Engine Shield Replacement.
- Lower the vehicle.
- Install the bolt and the ground wires at the rear of the left cylinder head.
Tighten
Tighten the bolt to 34 N·m (25 lb ft).
- Install the upper exhaust gas recirculation cooling pipe. Refer to
Exhaust Gas Recirculation Cooling Pipe Replacement - Upper.
- Install the generator bracket. Refer to
Generator Bracket Replacement.
- Install the right idler pulley and bolt (1).
Tighten
Tighten the bolt to 43 N·m (32 lb ft).
- Install the air conditioning compressor and the power steering pump mounting bracket. Refer to
Air Conditioning (A/C) Compressor and Power Steering Pump Bracket Replacement.
- Install the A/C compressor. Refer to
Air Conditioning Compressor Replacement.
- Position the engine wiring harness on the engine.
- Install the A/C suction hose to the accumulator.
- Install the drive belt. Refer to
Drive Belt Replacement.
- Connect the fuel hoses at the engine.
- Install the nut and the fuel hose bracket to the valve rocker arm cover stud.
Tighten
Tighten the nut to 21 N·m (15 lb ft).
- Connect the main engine electrical harness connectors.
- Push down on the latches (1) in order to connect the connectors.
- Close the harness clip (2).
- Install the cable junction block and bolt (1) to the power steering pump.
Tighten
Tighten the bolt to 9 N·m (80 lb in).
- If equipped, install the battery cable to the auxiliary generator.
- Install the battery cable to the generator.
Tighten
Tighten the nut to 9 N·m (80 lb in).
- Install the battery cable harness clip to the upper air intake tube.
- Connect the following electrical connectors:
• | Generator connector (1) |
• | A/C refrigerant switch (2) |
• | Dual generator harness connector (3), if equipped |
• | A/C compressor clutch (4) |
- Install the harness clip to the oil fill pipe.
- Install the radiator support. Refer to
Radiator Support Replacement.
- Install the radiator outlet hose. Refer to
Radiator Outlet Hose Replacement.
- Install the lower fan shroud. Refer to
Engine Coolant Fan Lower Shroud Replacement.
- Install the upper fan shroud. Refer to
Engine Coolant Fan Upper Shroud Replacement.
- Connect the inlet heater hose (1) to the heater core inlet.
Firmly push to quick connector onto the heater core
pipe until you hear an audible click.
- Install the outlet heater hose to the outlet radiator hose.
- Install the bolt retaining the heater hose pipe to the bracket.
Tighten
Tighten the bolt to 25 N·m (18 lb ft).
- Install the radiator inlet hose. Refer to
Radiator Inlet Hose Replacement.
- Install the charged air cooler pipes and hoses to the turbocharger and the charged air cooler. Refer to
Charge Air Cooler Inlet Pipe Replacement and
Charge Air Cooler Outlet Pipe Replacement.
- Install both fender wheelhouse inner panels (1). Refer to
Front Wheelhouse Liner Replacement - Right Side and
Front Wheelhouse Liner Replacement - Left Side.
- Install both front tires and wheels. Refer to
Tire and Wheel Removal and Installation.
- Install the surge tank. Refer to
Radiator Surge Tank Replacement.
- Install the air cleaner. Refer to
Air Cleaner Assembly Replacement.
- Connect the following engine wire harness connectors:
• | Install the engine wire harness clips to the wheelhouse inner panel (3). |
• | A/C pressure cycling switch (2) |
- Connect the batteries negative cables. Refer to
Battery Negative Cable Disconnection and Connection.
- Fill the engine coolant. Refer to
Cooling System Draining and Filling.
- Prelube the engine. Refer to
Engine Prelubing.
- Operate the engine, inspect for coolant, oil, fuel, and exhaust leaks.
- Inspect for proper oil pressure.
- Inspect for proper engine operation.
Note: There is a positive stop which limits the hood from being opened too far.
- With the aid of the assistant raise the hood slightly until the hood hinge bolts can be removed from the service position notch (1).
- With the aid of an assistant lower the hood and install the hood hinge bolts (2) to the hood hinges.
Tighten
Tighten the bolts to 25 N·m (18 lb ft).
- Install the air inlet grille end caps (1), push down the end cap in order to engage the retainers. (left side shown, right side similar).
- Install the ground strap to the hood stud.
- Install the ground strap nut at the hood stud.
Tighten
Tighten the nut to 9 N·m (80 lb in).
- Close the hood.
- Road test the vehicle for normal operation.
- Inspect for coolant, oil, or exhaust leaks.