GM Service Manual Online
For 1990-2009 cars only

    Notice: Refer to Fastener Notice in the Preface section.


    Object Number: 1968178  Size: SH
  1. Using a 13 mm socket, install the 2 oil baffle screws .

  2. Object Number: 1968203  Size: SH
  3. The anchor support assembly shows, 3 springs, 3 bushings, 2 pistons, and 1 support.

  4. Object Number: 1968176  Size: SH
  5. Assemble the 3 springs and 3 bushings.

  6. Object Number: 1968204  Size: SH
  7. Using pliers, install the 2 anchor pistons.

  8. Object Number: 1968205  Size: SH
  9. Using a wire, block the anchor bushings in order to ease in the assembly of the shift levers.
  10. Notice: Refer to Fastener Notice in the Preface section.


    Object Number: 1968175  Size: SH
  11. Using a 10 mm socket, install the anchor support assembly screws.
  12. Tighten
    Tighten the support assembly screws to 18-37 N·m (18-27 lb ft).


    Object Number: 1968206  Size: SH
  13. Using a driving tool, install a new oil seal if it was removed.

  14. Object Number: 1968166  Size: SH
  15. Using a 13 mm socket, temporarily install 7 bearing retaining bolts in the clutch housing.

  16. Object Number: 1968172  Size: SH
  17. Install the gear train spacer.

  18. Object Number: 1968170  Size: SH
  19. In the gear train housing, temporarily install new shims until the axial play is correct.

  20. Object Number: 1968208  Size: SH
  21. Using a hammer, install the drive shaft bearing race.

  22. Object Number: 1968174  Size: SH
  23. In the drive shaft housing, temporarily install new shims until the axial play is correct.
  24. Install the roller cage inside the drive shaft.