Step | Action | Value(s) | Yes | No | ||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | Did you perform the ALC Suspension System Check? | -- | Go to Step 2 | |||||||||
2 |
Is an open present in CKT 1840 (ORN)? | -- | Go to Step 3 | Go to Step 4 | ||||||||
3 | Repair the open in CKT 1840 (ORN). Is the repair complete? | -- | -- | |||||||||
4 | Test CKT 639 (PNK) at terminal A for an open circuit. Is an open present in CKT 639 (PNK)? | -- | Go to Step 5 | Go to Step 6 | ||||||||
5 | Repair the open in CKT 639 (PNK). Is the repair complete? | -- | -- | |||||||||
6 | Test CKT 1350 (BLK) at terminal G for an open circuit. Is an open present in CKT 1350 (BLK)? | -- | Go to Step 7 | Go to Step 8 | ||||||||
7 | Repair the open in CKT 1350 (BLK). Is the repair complete? | -- | -- | |||||||||
8 |
Is an open present in CKT 639 (PNK)? | -- | Go to Step 9 | Go to Step 10 | ||||||||
9 | Repair the open in the CKT 639 (PNK) between the load leveling height sensor and S473. Is the repair complete? | -- | -- | |||||||||
10 | Test CKT 1350 (BLK) at terminal A for an open circuit. Is an open present in CKT 1350 (BLK)? | -- | Go to Step 11 | Go to Step 12 | ||||||||
11 | Repair the open in CKT 1350 (BLK). Is the repair complete? | -- | -- | |||||||||
12 | Test CKT 1298 (LT BLU) at terminal C for an open circuit. Is an open present in CKT 1298 (LT BLU)? | -- | Go to Step 22 | Go to Step 13 | ||||||||
13 | Connect a fused jumper wire from terminal B, CKT 321 (YEL) to ground. Does the pump start and run? | -- | Go to Step 14 | Go to Step 15 | ||||||||
14 | Replace the load leveling height sensor. Refer to Automatic Level Control Sensor and Bracket Replacement . Is the replacement complete? | -- | -- | |||||||||
15 | Connect a fused jumper wire from the load leveling pump connector terminal D at CKT 321 (YEL) to ground. Does the pump start and run? | -- | Go to Step 16 | Go to Step 17 | ||||||||
16 | Repair the open in CKT 321 (YEL) between the load leveling pump and the load leveling height sensor. Is the repair complete? | -- | -- | |||||||||
17 |
Did you find an open circuit? | -- | Go to Step 18 | Go to Step 19 | ||||||||
18 | Repair the open circuit. Is the repair complete? | -- | -- | |||||||||
19 |
Does the test lamp illuminate? | -- | Go to Step 21 | Go to Step 20 | ||||||||
20 | Replace the load leveling pump relay. Refer to Air Compressor Relay Replacement . Is the replacement complete? | -- | -- | |||||||||
21 | Replace the load leveling pump. Refer to Air Compressor Replacement . Is the replacement complete? | -- | -- | |||||||||
22 |
Is an open present in CKT 1298 (LT BLU)? | -- | Go to Step 23 | Go to Step 24 | ||||||||
23 | Repair the open in CKT 1298 (LT BLU) between the load leveling timer relay and the load leveling height sensor. Is the repair complete? | -- | -- | |||||||||
24 | Test CKT 1840 (ORN) at terminal D for an open circuit. Is an open present in CKT 1840 (ORN)? | -- | Go to Step 25 | Go to Step 26 | ||||||||
25 | Repair the open in CKT 1840 (ORN). Is the repair complete? | -- | -- | |||||||||
26 | Replace the load leveling timer relay. Refer to Automatic Level Control Relay Replacement . Is the replacement complete? | -- | -- |