- Install a J 36857
(1) to both front cylinder heads.
- Install a J 36857
to both rear cylinder heads.
- Connect a short chain to the 2 front J 36857
(1).
- Connect a short chain to the 2 rear J 36857
.
- Install a suitable lifting device. The engine will have to be angled
in order to install. Use a load positioning sling to assist in angling the engine.
- Remove the engine from the stand. Refer to
Engine Removal from Stand
.
- Install the following:
- If equipped with a manual transmission, perform steps 9-15.
- Shift the transmission into high gear.
- With the transmission mounted to suitable
dolly, move the transmission into position under the vehicle.
- Rotate the output shaft to align the main drive gear shaft with the clutch
disc hub.
- Move
the transmission forward, guiding the main drive gear shaft into the clutch disc hub.
- Install the transmission.
• | Avoid springing the clutch when installing the transmission. |
• | Do not allow the transmission to drop or hang unsupported in the splined
hub of the clutch disc. |
Notice: Refer to Fastener Notice in the Preface section.
- Install the transmission apron housing bolts.
Tighten
Tighten the transmission apron housing bolts to
50 N·m (37 lb ft).
- Remove the transmission jack.
- If equipped with an automatic transmission,
perform the following:
16.1. | Reattach the transmission jack. |
16.2. | Raise the transmission to the engine. |
16.3. | Install the transmission to the engine while aligning the torque converter
with the engine flex plate. |
16.4. | Install the transmission to the engine bolts. |
Tighten
Tighten the transmission to engine bolts to 50 N·m
(37 lb ft).
16.5. | Install the nuts retaining the transmission fluid fill tube bracket. |
Tighten
Tighten the transmission fluid fill tube bracket
nuts to 18 N·m (13 lb ft).
16.6. | Install a long leveling devise to the 2 chains and support the
engine and transmission. |
16.7. | Remove the transmission jack. |
- Position the engine and transmission into the vehicle as far as possible.
- Install the transmission jack.
Important: Support the transmission with a transmission
jack that can support a load of at least 349 kg (750 lb).
- Install a safety chain to secure the transmission to the transmission jack.
- Remove the leveling device from the rear engine lift chain eye only.
- Install the engine and transmission to the engine mounts.
- Install the left and right front engine mount bolts. Refer to
Engine Mount Bracket Replacement - Left Side
and to
Engine Mount Bracket Replacement - Right Side
.
- Install the transmission mount to the transmission. Refer to
Transmission Mount Replacement
in Automatic Transmission - Allison.
- If equipped with an automatic transmission, perform the following:
24.1. | Turn the engine flex plate using a pry bar or engine at the harmonic balancer
in order to install the torque converter to the flywheel bolts. |
24.2. | When reusing the torque converter bolts, clean the bolts and apply Loctite. |
24.3. | Install the converter bolts. |
Tighten
Tighten the torque converter to flywheel bolts to
60 N·m (44 lb ft).
24.4. | If equipped, install the flywheel housing access cover. |
- Remove the overhead hoist.
- Remove the transmission jack.
- Install the starter assembly. Refer to
Starter Motor Replacement
in Engine Electrical.
- Install the parking brake cable to the park
brake linkage.
- If equipped with a manual transmission, perform the following:
29.1. | Install all electrical connectors to the transmission. |
29.2. | Install all electrical harness retainers. |
- If equipped with an automatic transmission perform the following:
30.3. | Connect the transmission electrical connectors and install the wiring
harness to the transmission. |
30.4. | If equipped, install the transmission heat shield with 2 bolts. |
Tighten
Tighten the transmission heat shield bolts to 15 N·m
(11 lb ft).
30.5. | If
equipped, install the shift cable to the transmission. |
30.6. | If equipped, install the transmission heat shield with 2 bolts. |
Tighten
Tighten the transmission heat shield bolts to 15 N·m
(11 lb ft).
- If equipped, install the fuel line brackets.
- If equipped, install the fuel lines to the fuel line brackets.
- Install the propeller shaft to the transmission. Refer to
One-Piece Rear Propeller Shaft Replacement
or to
Two-Piece Rear Propeller Shaft Replacement
or to
Three-Piece Rear Propeller Shaft Replacement
in Propeller Shaft.
- If equipped with an automatic transmission, install the transmission oil
cooler lines.
- Lower the vehicle, if required.
- Install the exhaust pipe to the exhaust
outlet.
- Install the exhaust manifold pipe to the exhaust outlet clamp.
Tighten
Tighten the exhaust pipe clamp to 40 N·m
(30 lb ft).
- Install the harness cable to the lower crankcase
with 2 bolts.
Tighten
Tighten the cable bracket bolts to 12 N·m
(106 lb in).
- Install the bolts holding the auxiliary
battery negative cable and the engine wiring harness ground wires to the right side
of the engine.
Tighten
Tighten the cable and ground wire bolts to 34 N·m
(25 lb ft).
- Install the engine harness to retainer and ground lead to engine block.
- If equipped, install the nut holding the
battery cable bracket to the right side of the lower crankcase.
Tighten
Tighten the cable bracket nut to 8 N·m
(71 lb in).
- Install the starter. Refer to
Starter Motor Replacement
in Engine Electrical.
- If equipped, connect the cord for the engine
coolant heater.
- Install the generator mounting bracket and
bolts.
Tighten
Tighten the generator mounting bracket bolts to
50 N·m (37 lb ft).
- If
equipped, install the battery cable to the auxiliary generator.
- Install
the battery cable to the generator.
Tighten
Tighten the generator battery cable nut to 9 N·m
(80 lb in).
- Connect the engine wiring harness to all
connectors on the engine.
- Install the A/C compressor bracket. Refer to
Air Conditioning (A/C) Compressor and Power Steering Pump Bracket Replacement
.
- Connect the fuel hoses at the engine.
- Connect both fuel injection control module harness connectors.
- Install the engine wire harness in the retainer.
- Connect all engine wiring to all connectors. Refer to
Engine Wiring Harness Assembly Replacement
in Engine Controls - 6.6L
(LLY).
- Install the outlet radiator hose to the
engine and tighten the hose clamp.
- Install the inlet radiator hose to the engine
and tighten the hose clamp.
- Install the cooling layer. Refer to
Cooling Layer Installation
in Engine Cooling.
- Connect the inlet heater hose to the heater pipe inlet.
- Install the engine wire harness clip to the engine bracket.
- Install the charged air cooler pipes and hoses to the turbocharger and
the charged air cooler. Refer to
Charged Air Cooler Hoses/Pipes Replacement
.
- Fill the engine with the proper capacity and quality of engine oil. Refer
to
Fluid and Lubricant Recommendations
and to
Engine Mechanical Specifications
in Maintenance and Lubrication.
- Install the air cleaner. Refer to
Air Cleaner Replacement
in Engine Controls - 6.6L (LLY).
- Connect the battery negative cables. Refer to
Battery Negative Cable Disconnection and Connection
in Engine Electrical.
- Install the engine cover. Refer to
Engine Cover Replacement
in Interior Trim.
- If equipped with a manual transmission, install the control lever and
boot. Refer to
Control Lever and/or Boot Replacement
in Manual Transmission - Medium Duty.
- Operate the engine, inspect for coolant, oil, fuel, and exhaust leaks.
- Inspect for proper oil pressure.
- Inspect for proper engine operation.
- Road test the vehicle for normal operation.