Removal Procedure
- Remove the air cleaner. Refer to
Air Cleaner Replacement
.
- Remove the air intake pipe. Refer to
Air Intake Pipe Replacement
.
- Remove the charged air pipe. Refer to
Charged Air Cooler Hoses/Pipes Replacement
for the 6.6L (LLY) engine.
- Remove the exhaust gas recirculation (EGR) cooler tube. Refer to
Exhaust Gas Recirculation Valve Cooler Replacement
.
- Reposition the fuel hose clamp at the return/junction block.
- Remove the hose from the return/junction block.
- Disconnect the right fuel return line from the return/junction block line.
- Reposition the return/junction block hose clamps (3).
- Remove the return/junction block hoses.
- Remove the return/junction block line clamp bolt (2).
- Remove the return/junction block bolt (1).
- Remove the return junction block.
Installation Procedure
Notice: Refer to Fastener Notice in the Preface section.
- Install the return junction block.
- Install the return/junction block bolt (1).
- Install the return/junction block line clamp bolt (2).
Tighten
Tighten the bolts to 25 N·m (18 lb ft).
- Install the return/junction block hoses.
- Position the return/junction block hose clamps (3).
- Connect the right fuel return line to the return/junction block line.
- Install the hose to the return/junction block.
- Position the fuel hose clamp at the return/junction block.
- Install the charged air pipe. Refer to
Charged Air Cooler Hoses/Pipes Replacement
for the 6.6L (LLY) engine.
- Install the air intake pipe. Refer to
Air Intake Pipe Replacement
.
- Install the EGR cooler tube. Refer to
Exhaust Gas Recirculation Valve Cooler Replacement
.
- Install the air cleaner. Refer to
Air Cleaner Replacement
.
- Prime the fuel system. Refer to
Fuel System Priming
.
- Start the engine. If the engine stalls, repeat step 13.
- Once the engine starts, inspect for fuel leaks.