GM Service Manual Online
For 1990-2009 cars only

Exhaust Gas Recirculation Coolant Hoses/Pipes Replacement LMM


Object Number: 1865362  Size: MF

Callout

Component Name

Preliminary Procedures

  1. Drain the cooling system. Refer to Cooling System Draining and Filling .
  2. Remove the engine cover. Refer to Engine Cover Replacement .

1

EGR Coolant Pipe Clamp

Procedure

Using the J 38185 , compress the clamps.

Special Tools

J 38185 Hose Clamp Pliers

2

EGR Coolant Pipe

Procedure

Disconnect the exhaust gas recirculation (EGR) coolant pipe from the EGR cooler tube.

Exhaust Gas Recirculation Coolant Hoses/Pipes Replacement LLY/LBZ


Object Number: 1729737  Size: MF

Callout

Component Name

Preliminary Procedures

    • Drain the cooling system. Refer to Cooling System Draining and Filling.
    • Remove the engine cover. Refer to Engine Cover Replacement.
    • Remove the generator. Refer to Generator Replacement.

1

Exhaust Gas Recirculation (EGR) Coolant Pipe to Thermostat Housing Bolt

Caution: Refer to Fastener Caution in the Preface section.

Tighten
21 N·m (16 lb ft)

2

EGR Coolant Pipe Bolt

Tighten
21 N·m (16 lb ft)

3

EGR Coolant Pipe

Tip

    • Compress the clamp and disconnect the EGR coolant pipe from the EGR cooler tube.
    • When installing the EGR coolant pipe, replace the O-ring seal.