Tools Required
• | J 25025-B
Dial Indicator Post and Guide Pin Set |
Notice: If the front end play check procedures are not closely followed, you
may select an incorrect selective thrust washer thickness. This could result
in severe damage to the internal transmission components.
- Assemble the
J 25025-B
by attaching the threaded rod and the dial indicator holder to one of the bolt holes on the transmission case assembly (7).
- Assemble the
J 8001-3
onto the dial indicator holder. Index the
J 8001-3
to the end of the turbine shaft (502).
- Eliminate any slack by pressing down on the turbine shaft (502).
- Using
J 28585
, apply upward pressure on the output carrier assembly to remove free play in the retainer ring.
- Set the
J 8001-3
to 0.
- Pull up on the turbine shaft (502) while holding up the output carrier assembly with the
J 28585
.
End Play Specification
The correct end play is 0.102-0.559 mm (0.004-0.022 in).
- Remove the tools from the transmission.
- If the front end play measurement is incorrect, refer to the
Overrun Clutch Housing Selective Thrust Washer Specifications
. Choose a new selective thrust washer based on the original selective washer and
the information contained in the table.
- Correct the end play by changing the overrun clutch housing selective thrust washer.