Callout | Component Name | ||||||
---|---|---|---|---|---|---|---|
Danger: Always perform the High Voltage Disabling procedure prior to servicing any High Voltage component or connection. Personal Protection Equipment (PPE) and proper procedures must be followed. The High Voltage Disabling procedure will perform the following tasks:
Preliminary Procedures
| |||||||
1 | A/C Compressor Cable Bolt (Qty: 2) Caution: High Voltage (HV) cables should never be removed from the mounting block. Removal of the individual HV cable from the mounting block may result in HV cable and/or component damage from improper:
Caution: Refer to Fastener Caution in the Preface section. Tighten | ||||||
2 | A/C Compressor Cable Mounting Bolt (Qty: 2) Tighten | ||||||
3 | A/C Compressor Cable | ||||||
4 | A/C Compressor Seal ProcedureRemove and discard the seal. | ||||||
5 | A/C Compressor Bolt (Qty: 3) Tighten | ||||||
6 | A/C Compressor Procedure
|
J 39400-A Halogen Leak Detector
Caution: Refer to Fastener Caution in the Preface section.