Callout | Component Name | ||||||
---|---|---|---|---|---|---|---|
Danger: Always perform the High Voltage Disabling procedure prior to servicing any High Voltage component or connection. Personal Protection Equipment (PPE) and proper procedures must be followed. The High Voltage Disabling procedure will perform the following tasks:
Preliminary Procedures
| |||||||
1 | Wiring Harness Connector (Qty: 4) | ||||||
2 | Drive Motor Battery Positive Relay Nuts (Qty: 2) Caution: Refer to Fastener Caution in the Preface section. Tighten | ||||||
3 | Drive Motor Battery Inverter Current Limit Relay ProcedureAfter the relay has been replaced and the re-assembly of the drive motor generator battery, enable the HV system. Refer to High Voltage Enabling. |