Removal Procedure
- Remove the engine sight shield. Refer to
Upper Intake Manifold Sight Shield Replacement
in Engine Mechanical
- 8.1L.
- Disconnect the fuel injector harness electrical connector (2).
- Disconnect the evaporative emission (EVAP)
purge tube at the purge solenoid.
- To disconnect the EVAP purge tube connector (1),
slide the retaining tab (2) to the release position and separate the connection.
- Disconnect the EVAP purge tube clip from
the fuel rail bracket.
- Disconnect the EVAP purge tube at the EVAP pipe.
Installation Procedure
- Connect the EVAP purge tube at the EVAP
pipe.
- Connect the EVAP purge tube clip to the fuel rail bracket.
- Connect the EVAP purge tube at the purge
solenoid.
- Connect the fuel injector harness electrical
connector (2).
- Install the engine sight shield. Refer to
Upper Intake Manifold Sight Shield Replacement
in Engine Mechanical - 8.1L.