Callout | Component Name | ||||||
---|---|---|---|---|---|---|---|
Danger: Always perform the High Voltage Disabling procedure prior to servicing any High Voltage component or connection. Personal Protection Equipment (PPE) and proper procedures must be followed. The High Voltage Disabling procedure will perform the following tasks:
Preliminary Procedures
| |||||||
1 | Accumulator Mounting Bracket Nut Caution: Refer to Fastener Caution in the Preface section. Tip Tighten | ||||||
2 | Accumulator Nut Tip Tighten | ||||||
3 | Accumulator Tip |
Callout | Component Name |
---|---|
Preliminary ProcedureRecover the refrigerant. Refer to Refrigerant Recovery and Recharging. | |
1 | Suction Hose Nut Caution: Refer to Fastener Caution in the Preface section. Tip Tighten |
2 | A/C Suction Hose |
3 | Sealing Washer Tip |
4 | Accumulator Mounting Bracket Nut Tighten |
5 | Accumulator Nut Tighten |
6 | Sealing Washer Tip |
7 | Accumulator Tip |