GM Service Manual Online
For 1990-2009 cars only

Removal Procedure


    Object Number: 803117  Size: SH
  1. Remove the clear clearance lamp. Refer to Clearance Lamp Replacement.
  2. If equipped with a luggage carrier cross car rail, loosen the lock knobs and slide the rails forward.
  3. Remove the rear luggage rail screw.

  4. Object Number: 1427917  Size: SH
  5. Remove the rear end cap screw.
  6. Disengage the rear end cap from the rear luggage rail.

  7. Object Number: 1428256  Size: SH
  8. Remove the side rail end cap from the roof panel.

Installation Procedure


    Object Number: 1428256  Size: SH
  1. Position the side rail end cap to the roof panel.
  2. Lock the forward edge of the end cap into the luggage carrier rail.
  3. Caution: Refer to Fastener Caution in the Preface section.

  4. Install the luggage rail screw to the end cap side rail.
  5. Tighten
    Tighten the screw to 10 N·m (89 lb in).


    Object Number: 1427917  Size: SH
  6. Install the rear end cap screw.
  7. Tighten
    Tighten the end cap screw to 10 N·m (89 lb in).

  8. If equipped with a luggage carrier cross rail, reposition and secure the lock knobs.

  9. Object Number: 803117  Size: SH
  10. Install the clear clearance lamp. Refer to Clearance Lamp Replacement.