Repair as much of the damage as possible, according to factory specifications.
Note the location and remove the sealers and anti-corrosion materials from the repair area, as necessary. Refer to
Anti-Corrosion Treatment and Repair.
Locate and drill out spot welds along lower weld flange at bed floor.
Locate and drill out the spot welds that attach the cross sills to the sill extensions, tie down reinforcements and the rear post to the rear cross sill.
Locate and drill out all remaining spot welds including along the front bed panel.