Tools Required
• | J 8087
Cylinder Bore Gage or Equivalent |
Inspection Procedure - Connecting Rods
- Coat the connecting rod bearings with engine oil.
- Install the upper connecting rod bearings into the connecting rod journals.
- Install the lower connecting rod bearings into the connecting rod bearing caps.
Important: Grease the connecting rod journals and lubricate the connecting rod bearings slightly so that the plastic gaging thread does not tear when the connecting rod bearing caps are removed.
- Inspect all of the connecting rod bearing clearances using a commercially available plastic gaging, ductile plastic threads.
- Cut the plastic gaging threads to the length of the bearing width. Lay them axially between the connecting rod journals and the connecting rod bearings.
- Install the connecting rod bearing caps.
Notice: Refer to Fastener Notice in the Preface section.
- Install the connecting rod bearing cap bolts.
Tighten
Tighten the bolts to 35 N·m (26 lb ft) using a torque wrench. Using
J 45059
and
KM-470-B
(1),
tighten the bolts plus 45 degrees plus 15 degrees.
- Remove the connecting rod bearing caps.
- Measure the width of the flattened plastic thread of the plastic gaging using a ruler. Plastic gaging is available for different tolerance ranges.
- Inspect the bearing clearance for permissible tolerance ranges.