GM Service Manual Online
For 1990-2009 cars only

Removal Procedure


    Object Number: 1291147  Size: SH
  1. Remove the fuel pump fuse.
  2. Start the engine. After it stalls, crank the engine for 10 seconds to rid the fuel system of fuel pressure.
  3. Warning: Refer to Battery Disconnect Warning in the Preface section.

  4. Disconnect the negative battery cable.
  5. Disconnect the electronic control module (ECM) ground terminal from the intake manifold.
  6. Warning: Refer to Safety Glasses Warning in the Preface section.

  7. Drain the engine coolant. Refer to Cooling System Draining and Filling.

  8. Object Number: 1291138  Size: SH
  9. Remove the engine cover and throttle body. Refer to Throttle Body Assembly Replacement.

  10. Object Number: 1291148  Size: SH
  11. Disconnect the intake manifold pressure sensor connector, attaching bolt and vacuum hose.

  12. Object Number: 1291151  Size: SH
  13. Disconnect the intake air temperature (IAT) sensor connector and remove the IAT sensor.

  14. Object Number: 1291152  Size: SH
  15. Remove the fuel rail bolts and the fuel rail.

  16. Object Number: 1291153  Size: SH
  17. Remove the all the vacuum hoses from the intake manifold including the positive crankcase ventilation (PCV) hose and the brake booster vacuum hose.
  18. Remove the exhaust gas recirculation (EGR) pipe.

  19. Object Number: 1291155  Size: SH
  20. Remove the alternator. Refer to Generator Replacement.
  21. Remove the intake manifold support bracket.

  22. Object Number: 1291157  Size: SH
  23. Remove the intake manifold retaining bolts/nuts in the sequence shown.
  24. Remove the intake manifold and gasket.
  25. Clean the sealing surfaces of the intake manifold and the cylinder head.

Installation Procedure

    Caution: Refer to Fastener Caution in the Preface section.


    Object Number: 1291167  Size: SH
  1. Install the fuel rail.
  2. Tighten
    Tighten the fuel rail bolts to 25 N·m (18 lb ft).

  3. Install the new intake manifold gasket and intake manifold.
  4. Tighten
    Tighten the intake manifold bolts and nuts to 25 N·m (18 lb ft).


    Object Number: 1291180  Size: SH
  5. Install the exhaust gas recirculation (EGR) pipe.
  6. Tighten
    Tighten the exhaust gas recirculation (EGR) pipe bolts to 10 N·m (89 lb ft).


    Object Number: 1291191  Size: SH
  7. Install the intake manifold support bracket.
  8. Tighten

        • Tighten the intake manifold support bracket upper bolts to 25 N·m (18 lb ft).
        • Tighten the lower bolts to 45 N·m (33 lb ft).
  9. Install the alternator.

  10. Object Number: 1291151  Size: SH
  11. Install the IAT and connect the IAT sensor connector.

  12. Object Number: 1291148  Size: SH
  13. Install the intake manifold pressure sensor and vacuum hose.

  14. Object Number: 1291138  Size: SH
  15. Install the throttle body and engine cover.
  16. Refill the engine cooling system. Refer to Cooling System Draining and Filling.
  17. Install the fuel pump fuse and connect the negative battery cable.