Exhaust Manifold Replacement 7.8L With CTF
Removal Procedure
- Remove the front exhaust pipe. Refer to
Front Pipe Replacement
.
- Remove the exhaust gas recirculation (EGR) pipe. Refer to
Exhaust Gas Recirculation Pipe Replacement
.
- Remove the 2 heat shield bolts.
- Remove the turbocharger. Refer to
Turbocharger Replacement
.
- Remove the exhaust manifold nuts (1-12), washers, spacers and heat shield.
- Remove the exhaust manifold with the gasket.
Installation Procedure
- Install the exhaust manifold and gasket to the cylinder head.
- Install the exhaust manifold nuts, washers, spacers and the heat shield.
- Install the 2 heat shield bolts.
- Install the EGR pipe. Refer to
Exhaust Gas Recirculation Pipe Replacement
.
Notice: Refer to Fastener Notice in the Preface section.
- Tighten the exhaust manifold nuts in the proper sequence.
Tighten
• | Tighten the nuts (7, 12) to 34 N·m (25 lb ft). |
• | Tighten the nuts (1-6, 8-11) to 55 N·m (41 lb ft). |
- Install the turbocharger. Refer to
Turbocharger Replacement
.
- Install the front exhaust pipe. Refer to
Front Pipe Replacement
.
Exhaust Manifold Replacement Without CTF
Removal Procedure
- Remove the turbocharger assembly. Refer to
Turbocharger Replacement
in Engine Controls - 7.8L.
- Remove the front exhaust pipe. Refer to
Front Pipe Replacement
.
- Remove the exhaust manifold nuts, bolts, washers and the spacers.
- Remove the exhaust manifold with the gasket.
Installation Procedure
- Install the exhaust manifold and gasket to the cylinder head.
- Install the exhaust manifold nuts, bolts, washers and the spacers.
Notice: Refer to Fastener Notice in the Preface section.
- Tighten the exhaust manifold nuts and bolts in the
proper sequence.
Tighten
Tighten the nuts and bolts to 34 N·m (25 lb ft).
- Install the front exhaust pipe. Refer to
Front Pipe Replacement
.
- Install the turbocharger assembly. Refer to
Turbocharger Replacement
in Engine Controls - 7.8L.