Removal Procedure
- Block the wheels.
- Drain all the air reservoirs. Refer to
Draining Reservoirs
.
- Remove the air line from the pressure protection valve. Refer
to the following procedures:
• | Hose and Line Replacement - Nylon Push-In Type Fitting |
• | Hose and Line Replacement - Flexible |
• | Hose and Line Replacement - Trailer and Emergency |
- Remove the pressure protection valve.
Installation Procedure
Notice: Use the correct fastener in the correct location. Replacement fasteners
must be the correct part number for that application. Fasteners requiring
replacement or fasteners requiring the use of thread locking compound or sealant
are identified in the service procedure. Do not use paints, lubricants, or
corrosion inhibitors on fasteners or fastener joint surfaces unless specified.
These coatings affect fastener torque and joint clamping force and may damage
the fastener. Use the correct tightening sequence and specifications when
installing fasteners in order to avoid damage to parts and systems.
- Install the pressure
protection valve.
Tighten
Tighten the pressure protection valve to 30 N·m (22 lb ft).
- Install the air line to the pressure protection valve.
- Perform the air leakage test. Refer to Pressure Protection Valve Leakage Test
.
- Perform the operational test. Refer to
Pressure Protection Valve Operational Check
.
- Remove the wheel blocks.