Tools Required
• | J 25025-B
Dial Indicator Post and Guide Pin Set |
- Assemble the
J 25025-B
by attaching the threaded rod and the dial indicator holder to one of the case
extension bolt holes on the transmission case (7).
- Push the output shaft assembly (671) in to remove any slack.
- Install the
J 8001-3
on the dial indicator holder. Index the
J 8001-3
to the end of the output shaft (671).
- Set the
J 8001-3
to 0.
- Move the output shaft (671) in and out, noting the amount of end play.
End Play Specification
The correct end play is 0.127-0.508 mm (0.005-0.020 in).
If the end play is not correct, change the output shaft selective thrust washer (674). Refer to the
Output Shaft Selective Thrust Washer Specifications
.
- Remove the tools.
Tools Required
• | J 25025-B Pump
and Valve Body Alignment Pin Set |
- Assemble the J 25025-B
by attaching the threaded rod and the
dial indicator holder to one of the case extension bolt holes on the transmission
case (7).
- Push the output shaft assembly (671) in to remove any slack.
- Install the J 8001-3
on the dial indicator holder. Index the J 8001-3
to the end of the output shaft (671).
- Set the J 8001-3
to 0.
- Move the output shaft (671) in and out, noting the amount
of end play.
• | The correct end play is: |
Specification
0.127-0.635 mm (0.005-0.025 in).
- Remove the tools.