Step | Action | Value(s) | Yes | No |
---|---|---|---|---|
Important: Inspect for mechanical binding and ensure that the transmission linkage is adjusted properly prior to performing this diagnostic procedure. | ||||
1 | Did you perform the BTSI System Check? | -- | Go to Step 2 | Go to Automatic Transmission Shift Lock Control System Check |
2 |
Does the TCC/stoplamp switch operate properly? | -- | Go to Step 4 | Go to Step 3 |
3 | Replace the TCC/stoplamp switch. Refer to Stop Lamp Switch Replacement . Is the repair complete? | -- | Go to Automatic Transmission Shift Lock Control System Check | -- |
4 |
Does the test lamp light? | -- | Go to Step 6 | Go to Step 5 |
5 | Locate and repair an open in the park solenoid or CKT 584 (DK GRN/BLK). Is the repair complete? | -- | Go to Automatic Transmission Shift Lock Control System Check | -- |
6 | Locate and repair a short to power in the park solenoid or CKT 1134 (DK GRN/WHT). Is the repair complete? | -- | Go to Automatic Transmission Shift Lock Control System Check | -- |