Removal Procedure
- Remove the instrument
panel. Refer to
Instrument Panel Assembly Replacement
in Instrument Panel, Gauges and Console.
- Remove the bolts (4) that retain supplemental restraint IP module
to the instrument panel.
- Remove the nuts (5) from the studs that retain the supplemental
restraint IP module (2) to the instrument panel (3).
- Remove the supplemental restraint IP module (2) from the instrument
panel (3).
Installation Procedure
- Install the supplemental
restraint IP module (2) to the instrument panel (3).
Notice: Use the correct fastener in the correct location. Replacement fasteners
must be the correct part number for that application. Fasteners requiring
replacement or fasteners requiring the use of thread locking compound or sealant
are identified in the service procedure. Do not use paints, lubricants, or
corrosion inhibitors on fasteners or fastener joint surfaces unless specified.
These coatings affect fastener torque and joint clamping force and may damage
the fastener. Use the correct tightening sequence and specifications when
installing fasteners in order to avoid damage to parts and systems.
- Install
the screws (4) that retain the supplemental restraint module to the instrument
panel.
Tighten
Tighten the fasteners to 8.0 N·m(7 lb in).
- Install the nuts (5) to the studs (1) in order to retain the inflatable
restraint IP module to the instrument panel.
Tighten
Tighten the nuts to 8 N·m(71 lb in
- Install the instrument panel. Refer to
Instrument Panel Assembly Replacement
in Instrument Panel, Gauges and Console.