Step | Action | Value(s) | Yes | No |
---|---|---|---|---|
1 | Did you perform the Backup Lights System Check? | -- | Go to Step 2 | Go to Backup Lamp System Check |
2 |
Is voltage present? | Battery Voltage | Go to Step 4 | Go to Step 3 |
3 | Locate and repair the open in CKT 1324 (LT GRN) at splice pack SP400. Is the repair complete? | -- | Go to Backup Lamp System Check | -- |
4 | Connect the J 39200 DMM between CKT 1324 (LT GRN) at the lamp socket and CKT 1750/2250 (BLK) at the lamp socket. Is voltage present? | Battery Voltage | Go to Step 5 | Go to Step 8 |
5 | Inspect the lamp socket for damaged or corroded terminals. Are the lamp socket terminals damaged or corroded? | -- | Go to Step 6 | Go to Step 7 |
6 | Repair or replace the lamp socket as needed. Is the repair complete? | -- | Go to Backup Lamp System Check | -- |
7 | Replace the bulb. Is the repair complete? | -- | Go to Backup Lamp System Check | -- |
8 |
Is the repair complete? | -- | Go to Backup Lamp System Check | -- |