Step | Action | Value(s) | Yes | No |
---|---|---|---|---|
1 | Did you perform the IPC System Check? | -- | Go to Step 2 | Go to IPC System Check |
2 |
Does the test lamp light? | -- | Go to Step 4 | Go to Step 3 |
3 |
Is positive battery voltage present at CKT 1020 (PNK) IP cluster connector cavity A8? | Battery positive voltage | Go to Step 4 | -- |
4 |
Does the test lamp light? | -- | Go to Step 6 | Go to Step 5 |
5 |
Is positive battery voltage present at CKT 39 (PNK) IP cluster connector cavity A7? | Battery positive voltage | Go to Step 6 | -- |
6 |
Does the test lamp light? | -- | Go to Step 8 | Go to Step 7 |
7 |
Is positive battery voltage present at CKT 1220 (GRY) IP cluster cavity A7? | Battery positive voltage | Go to Step 8 | -- |
8 | Connect a test lamp between CKT 340 (ORN) cluster connector terminal A10 and ground. Does the test lamp light? | -- | Go to Step 10 | Go to Step 9 |
9 |
Is positive battery voltage present at CKT 340 (ORN) IP cluster connector cavity A10? | Battery positive voltage | Go to Step 10 | -- |
10 | Connect a test lamp between CKT 340 (ORN) at the IP cluster connector terminal A10 and CKT 451 (BLK/WHT) ground at terminal A9. Does the test lamp light? | -- | Go to Step 12 | Go to Step 11 |
11 | Repair the open in CKT 451 (BLK/WHT) between the IP cluster connector terminal A9 and ground. Is the repair complete? | -- | Go to IPC System Check | -- |
12 | Connect a test lamp between CKT 340 (ORN) at the IP cluster connector A10 and the CKT 1850 (BLK) ground wire at terminal B3. Does the test lamp light? | -- | Go to IPC System Check | Go to Step 13 |
13 | Repair the open in CKT 1850 (BLK) between the IP cluster connector terminal B3 and ground. Is the repair complete? | -- | Go to IPC System Check | -- |